Category: Law as Amended

  • Sec. 20012. Department of Defense oversight | Law as Amended

    In addition to amounts otherwise available, there is appropriated to the Inspector General of the Department of Defense for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, $10,000,000, to remain available through September 30, 2029, to monitor Department of Defense activities for which funding is appropriated in this title, including—

    (1) programs with mutual technological dependencies;[1]Need tracking source

    (2) programs with related data management and data ownership considerations; and[2]Need tracking source

    (3) programs particularly vulnerable to supply chain disruptions and long lead time components.[3]Need tracking source


    1. Footnotes ↩︎

    2. Footnotes ↩︎

    3. Footnotes ↩︎

  • Sec. 20010. Enhancement of Department of Defense resources for improving the readiness of the Department of Defense | Law as Amended

    In addition to amounts otherwise available, there are appropriated to the Secretary of Defense for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029—

    (1) $1,400,000,000 for a pilot program on OPN-8 maritime spares and repair rotable pool;[1]Need tracking source

    (2) $700,000,000 for a pilot program on OPN-8 maritime spares and repair rotable pool for amphibious ships;[2]Need tracking source

    (3) $2,118,000,000 for spares and repairs to keep Air Force aircraft mission capable;[3]Need tracking source

    (4) $1,500,000,000 for Army depot modernization and capacity enhancement;[4]Need tracking source

    (5) $2,000,000,000 for Navy depot and shipyard modernization and capacity enhancement;[5]Need tracking source

    (6) $250,000,000 for Air Force depot modernization and capacity enhancement;[6]Need tracking source

    (7) $1,640,000,000 for Special Operations Command equipment, readiness, and operations;[7]Need tracking source

    (8) $500,000,000 for National Guard unit readiness;[8]Need tracking source

    (9) $400,000,000 for Marine Corps readiness and capabilities;[9]Need tracking source

    (10) $20,000,000 for upgrades to Marine Corps utility helicopters;[10]Need tracking source

    (11) $310,000,000 for next-generation vertical lift, assault, and intra-theater aeromedical evacuation aircraft;[11]Need tracking source

    (12) $75,000,000 for the procurement of anti-lock braking systems for Army wheeled transport vehicles;[12]Need tracking source

    (13) $230,000,000 for the procurement of Army wheeled combat vehicles;[13]Need tracking source

    (14) $63,000,000 for the development of advanced rotary-wing engines;[14]Need tracking source

    (15) $241,000,000 for the development, procurement, and integration of Marine Corps amphibious vehicles;[15]Need tracking source

    (16) $250,000,000 for the procurement of Army tracked combat transport vehicles;[16]Need tracking source

    (17) $98,000,000 for additional Army light rotary-wing capabilities;[17]Need tracking source

    (18) $1,500,000,000 for increased depot maintenance and shipyard maintenance activities;[18]Need tracking source

    (19) $2,500,000,000 for Air Force facilities sustainment, restoration, and modernization;[19]Need tracking source

    (20) $92,500,000 for the completion of Robotic Combat Vehicle prototyping;[20]Need tracking source

    (21) $125,000,000 for Army operations;[21]Need tracking source

    (22) $10,000,000 for the Air Force Concepts, Development, and Management Office; and[22]Need tracking source

    (23) $320,000,000 for Joint Special Operations Command.[23]Need tracking source


    1. Footnotes ↩︎

    2. Footnotes ↩︎

    3. Footnotes ↩︎

    4. Footnotes ↩︎

    5. Footnotes ↩︎

    6. Footnotes ↩︎

    7. Footnotes ↩︎

    8. Footnotes ↩︎

    9. Footnotes ↩︎

    10. Footnotes ↩︎

    11. Footnotes ↩︎

    12. Footnotes ↩︎

    13. Footnotes ↩︎

    14. Footnotes ↩︎

    15. Footnotes ↩︎

    16. Footnotes ↩︎

    17. Footnotes ↩︎

    18. Footnotes ↩︎

    19. Footnotes ↩︎

    20. Footnotes ↩︎

    21. Footnotes ↩︎

    22. Footnotes ↩︎

    23. Footnotes ↩︎

  • Sec. 20011. Improving Department of Defense border support and counter-drug missions | Law as Amended

    In addition to amounts otherwise available, there are appropriated to the Secretary of Defense for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029, $1,000,000,000 for the deployment of military personnel in support of border operations[1]Need tracking source, operations and maintenance activities in support of border operations[2]Need tracking source, counter-narcotics and counter-transnational criminal organization mission support[3]Need tracking source, the operation of national defense areas and construction in national defense areas[4]Need tracking source, and the temporary detention of migrants on Department of Defense installations[5]Need tracking source, in accordance with chapter 15 of title 10, United States Code.


    1. Footnotes ↩︎

    2. Footnotes ↩︎

    3. Footnotes ↩︎

    4. Footnotes ↩︎

    5. Footnotes ↩︎

  • Sec. 20008. Enhancement of resources for nuclear forces | Law as Amended

    (a) DOD appropriations.—In addition to amounts otherwise available, there are appropriated to the Secretary of Defense for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029—

    (1) $2,500,000,000 for risk reduction activities for the Sentinel intercontinental ballistic missile program;[1]Need tracking source

    (2) $4,500,000,000 only for expansion of production capacity of B–21 long-range bomber aircraft and the purchase of aircraft only available through the expansion of production capacity;[2]Need tracking source

    (3) $500,000,000 for improvements to the Minuteman III intercontinental ballistic missile system;[3]Need tracking source

    (4) $100,000,000 for capability enhancements to intercontinental ballistic missile reentry vehicles;[4]Need tracking source

    (5) $148,000,000 for the expansion of D5 missile motor production;[5]Need tracking source

    (6) $400,000,000 to accelerate the development of Trident D5LE2 submarine-launched ballistic missiles;[6]Need tracking source

    (7) $2,000,000,000 to accelerate the development, procurement, and integration of the nuclear-armed sea-launched cruise missile;[7]Need tracking source

    (8) $62,000,000 to convert Ohio-class submarine tubes to accept additional missiles, not to be obligated before March 1, 2026;[8]Need tracking source

    (9) $168,000,000 to accelerate the production of the Survivable Airborne Operations Center program;[9]Need tracking source

    (10) $65,000,000 to accelerate the modernization of nuclear command, control, and communications;[10]Need tracking source

    (11) $210,300,000 for the increased production of MH–139 helicopters; and[11]Need tracking source

    (12) $150,000,000 to accelerate the development, procurement, and integration of military nuclear weapons delivery programs.[12]Need tracking source

    (b) NNSA appropriations.—In addition to amounts otherwise available, there are appropriated to the Administrator of the National Nuclear Security Administration for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029—

    (1) $200,000,000 to perform National Nuclear Security Administration Phase 1 studies pursuant to section 3211 of the National Nuclear Security Administration Act (50 U.S.C. 2401);[13]Need tracking source

    (2) $540,000,000 to address deferred maintenance and repair needs of the National Nuclear Security Administration pursuant to section 3211 of the National Nuclear Security Administration Act (50 U.S.C. 2401);[14]Need tracking source

    (3) $1,000,000,000 to accelerate the construction of National Nuclear Security Administration facilities pursuant to section 3211 of the National Nuclear Security Administration Act (50 U.S.C. 2401);[15]Need tracking source

    (4) $400,000,000 to accelerate the development, procurement, and integration of the warhead for the nuclear-armed sea-launched cruise missile pursuant to section 3211 of the National Nuclear Security Administration Act (50 U.S.C. 2401);[16]Need tracking source

    (5) $750,000,000 to accelerate primary capability modernization pursuant to section 3211 of the National Nuclear Security Administration Act (50 U.S.C. 2401);[17]Need tracking source

    (6) $750,000,000 to accelerate secondary capability modernization pursuant to section 3211 of the National Nuclear Security Administration Act (50 U.S.C. 2401);[18]Need tracking source

    (7) $120,000,000 to accelerate domestic uranium enrichment centrifuge deployment for defense purposes pursuant to section 3211 of the National Nuclear Security Administration Act (50 U.S.C. 2401);[19]Need tracking source

    (8) $10,000,000 for National Nuclear Security Administration evaluation of spent fuel reprocessing technology; and[20]Need tracking source

    (9) $115,000,000 for accelerating nuclear national security missions through artificial intelligence.[21]Need tracking source


    1. Footnotes ↩︎

    2. Footnotes ↩︎

    3. Footnotes ↩︎

    4. Footnotes ↩︎

    5. Footnotes ↩︎

    6. Footnotes ↩︎

    7. Footnotes ↩︎

    8. Footnotes ↩︎

    9. Footnotes ↩︎

    10. Footnotes ↩︎

    11. Footnotes ↩︎

    12. Footnotes ↩︎

    13. Footnotes ↩︎

    14. Footnotes ↩︎

    15. Footnotes ↩︎

    16. Footnotes ↩︎

    17. Footnotes ↩︎

    18. Footnotes ↩︎

    19. Footnotes ↩︎

    20. Footnotes ↩︎

    21. Footnotes ↩︎

  • Sec. 20007. Enhancement of Department of Defense resources for air superiority | Law as Amended

    In addition to amounts otherwise available, there are appropriated to the Secretary of Defense for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029—

    (1) $3,150,000,000 to increase F–15EX aircraft production;[1]Need tracking source

    (2) $361,220,000 to prevent the retirement of F–22 aircraft;[2]Need tracking source

    (3) $127,460,000 to prevent the retirement of F–15E aircraft;[3]Need tracking source

    (4) $187,000,000 to accelerate installation of F–16 electronic warfare capability;[4]Need tracking source

    (5) $116,000,000 for C–17A Mobility Aircraft Connectivity;[5]Need tracking source

    (6) $84,000,000 for KC–135 Mobility Aircraft Connectivity;[6]Need tracking source

    (7) $440,000,000 to increase C–130J production;[7]Need tracking source

    (8) $474,000,000 to increase EA–37B production;[8]Need tracking source

    (9) $678,000,000 to accelerate the Collaborative Combat Aircraft program;[9]Need tracking source

    (10) $400,000,000 to accelerate production of the F–47 aircraft;[10]Need tracking source

    (11) $750,000,000 accelerate the FA/XX aircraft;[11]Need tracking source

    (12) $100,000,000 for production of Advanced Aerial Sensors;[12]Need tracking source

    (13) $160,000,000 to accelerate V–22 nacelle and reliability and safety improvements;[13]Need tracking source

    (14) $100,000,000 to accelerate production of MQ–25 aircraft;[14]Need tracking source

    (15) $270,000,000 for development, procurement, and integration of Marine Corps unmanned combat aircraft;[15]Need tracking source

    (16) $96,000,000 for the procurement and integration of infrared search and track pods;[16]Need tracking source

    (17) $50,000,000 for the procurement and integration of additional F–15EX conformal fuel tanks;[17]Need tracking source

    (18) $600,000,000 for the development, procurement, and integration of Air Force long-range strike aircraft; and[18]Need tracking source

    (19) $500,000,000 for the development, procurement, and integration of Navy long-range strike aircraft.[19]Need tracking source


    1. Footnotes ↩︎

    2. Footnotes ↩︎

    3. Footnotes ↩︎

    4. Footnotes ↩︎

    5. Footnotes ↩︎

    6. Footnotes ↩︎

    7. Footnotes ↩︎

    8. Footnotes ↩︎

    9. Footnotes ↩︎

    10. Footnotes ↩︎

    11. Footnotes ↩︎

    12. Footnotes ↩︎

    13. Footnotes ↩︎

    14. Footnotes ↩︎

    15. Footnotes ↩︎

    16. Footnotes ↩︎

    17. Footnotes ↩︎

    18. Footnotes ↩︎

    19. Footnotes ↩︎

  • Sec. 20006. Enhancement of Department of Defense resources for improving the efficiency and cybersecurity of the Department of Defense | Law as Amended

    In addition to amounts otherwise available, there are appropriated to the Secretary of Defense for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029—

    (1) $150,000,000 for business systems replacement to accelerate the audits of the financial statements of the Department of Defense pursuant to chapter 9A and section 2222 of title 10, United States Code;[1]Need tracking source

    (2) $200,000,000 for the deployment of automation and artificial intelligence to accelerate the audits of the financial statements of the Department of Defense pursuant to chapter 9A and section 2222 of title 10, United States Code;[2]Need tracking source

    (3) $10,000,000 for the improvement of the budgetary and programmatic infrastructure of the Office of the Secretary of Defense; and[3]Need tracking source

    (4) $20,000,000 for defense cybersecurity programs of the Defense Advanced Research Projects Agency.[4]Need tracking source


    1. Footnotes ↩︎

    2. Footnotes ↩︎

    3. Footnotes ↩︎

    4. Footnotes ↩︎

  • Sec. 20004. Enhancement of Department of Defense resources for munitions and defense supply chain resiliency | Law as Amended

    (a) Appropriations.—In addition to amounts otherwise available, there are appropriated to the Secretary of Defense for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029—

    (1) $400,000,000 for the development, production, and integration of Navy and Air Force long-range anti-ship missiles;[1]Need tracking source

    (2) $380,000,000 for production capacity expansion for Navy and Air Force long-range anti-ship missiles;[2]Need tracking source

    (3) $490,000,000 for the development, production, and integration of Navy and Air Force long-range air-to-surface missiles;[3]Need tracking source

    (4) $94,000,000 for the development, production, and integration of alternative Navy and Air Force long-range air-to-surface missiles;[4]Need tracking source

    (5) $630,000,000 for the development, production, and integration of long-range Navy air defense and anti-ship missiles;[5]Need tracking source

    (6) $688,000,000 for the development, production, and integration of long-range multi-service cruise missiles;[6]Need tracking source

    (7) $250,000,000 for production capacity expansion and supplier base strengthening of long-range multi-service cruise missiles;[7]Need tracking source

    (8) $70,000,000 for the development, production, and integration of short-range Navy and Marine Corps anti-ship missiles;[8]Need tracking source

    (9) $100,000,000 for the development of an anti-ship seeker for short-range Army ballistic missiles;[9]Need tracking source

    (10) $175,000,000 for production capacity expansion for next-generation Army medium-range ballistic missiles;[10]Need tracking source

    (11) $50,000,000 for the mitigation of diminishing manufacturing sources for medium-range air-to-air missiles;[11]Need tracking source

    (12) $250,000,000 for the procurement of medium-range air-to-air missiles;[12]Need tracking source

    (13) $225,000,000 for the expansion of production capacity for medium-range air-to-air missiles;[13]Need tracking source

    (14) $50,000,000 for the development of second sources for components of short-range air-to-air missiles;[14]Need tracking source

    (15) $325,000,000 for production capacity improvements for air-launched anti-radiation missiles;[15]Need tracking source

    (16) $50,000,000 for the accelerated development of Army next-generation medium-range anti-ship ballistic missiles;[16]Need tracking source

    (17) $114,000,000 for the production of Army next-generation medium-range ballistic missiles;[17]Need tracking source

    (18) $300,000,000 for the production of Army medium-range ballistic missiles;[18]Need tracking source

    (19) $85,000,000 for the accelerated development of Army long-range ballistic missiles;[19]Need tracking source

    (20) $400,000,000 for the production of heavyweight torpedoes;[20]Need tracking source

    (21) $200,000,000 for the development, procurement, and integration of mass-producible autonomous underwater munitions;[21]Need tracking source

    (22) $70,000,000 for the improvement of heavyweight torpedo maintenance activities;[22]Need tracking source

    (23) $200,000,000 for the production of lightweight torpedoes;[23]Need tracking source

    (24) $500,000,000 for the development, procurement, and integration of maritime mines;[24]Need tracking source

    (25) $50,000,000 for the development, procurement, and integration of new underwater explosives;[25]Need tracking source

    (26) $55,000,000 for the development, procurement, and integration of lightweight multi-mission torpedoes;[26]Need tracking source

    (27) $80,000,000 for the production of sonobuoys;[27]Need tracking source

    (28) $150,000,000 for the development, procurement, and integration of air-delivered long-range maritime mines;[28]Need tracking source

    (29) $61,000,000 for the acceleration of Navy expeditionary loitering munitions deployment;[29]Need tracking source

    (30) $50,000,000 for the acceleration of one-way attack unmanned aerial systems with advanced autonomy;[30]Need tracking source

    (31) $1,000,000,000 for the expansion of the one-way attack unmanned aerial systems industrial base;[31]Need tracking source

    (32) $200,000,000 for investments in solid rocket motor industrial base through the Industrial Base Fund established under section 4817 of title 10, United States Code;[32]Need tracking source

    (33) $400,000,000 for investments in the emerging solid rocket motor industrial base through the Industrial Base Fund established under section 4817 of title 10, United States Code;[33]Need tracking source

    (34) $42,000,000 for investments in second sources for large-diameter solid rocket motors for hypersonic missiles;[34]Need tracking source

    (35) $1,000,000,000 for the creation of next-generation automated munitions production factories;[35]Need tracking source

    (36) $170,000,000 for the development of advanced radar depot for repair, testing, and production of radar and electronic warfare systems;[36]Need tracking source

    (37) $25,000,000 for the expansion of the Department of Defense industrial base policy analysis workforce;[37]Need tracking source

    (38) $30,300,000 for the repair of Army missiles;[38]Need tracking source

    (39) $100,000,000 for the production of small and medium ammunition;[39]Need tracking source

    (40) $2,000,000,000 for additional activities to improve the United States stockpile of critical minerals through the National Defense Stockpile Transaction Fund, authorized by subchapter III of chapter 5 of title 50, United States Code;[40]Need tracking source

    (41) $10,000,000 for the expansion of the Department of Defense armaments cooperation workforce;[41]Need tracking source

    (42) $500,000,000 for the expansion of the Defense Exportability Features program;[42]Need tracking source

    (43) $350,000,000 for production of Navy long-range air and missile defense interceptors;[43]Need tracking source

    (44) $93,000,000 for replacement of Navy long-range air and missile defense interceptors;[44]Need tracking source

    (45) $100,000,000 for development of a second solid rocket motor source for Navy air defense and anti ship missiles;[45]Need tracking source

    (46) $65,000,000 for expansion of production capacity of Missile Defense Agency long-range anti-ballistic missiles;[46]Need tracking source

    (47) $225,000,000 for expansion of production capacity for Navy air defense and anti-ship missiles;[47]Need tracking source

    (48) $103,300,000 for expansion of depot level maintenance facility for Navy long-range air and missile defense interceptors;[48]Need tracking source

    (49) $18,000,000 for creation of domestic source for guidance section of Navy short-range air defense missiles;[49]Need tracking source

    (50) $65,000,000 for integration of Army medium-range air and missile defense interceptor with Navy ships;[50]Need tracking source

    (51) $176,100,000 for production of Army long-range movable missile defense radar;[51]Need tracking source

    (52) $167,000,000 for accelerated fielding of Army short-range gun-based air and missile defense system;[52]Need tracking source

    (53) $40,000,000 for development of low-cost alternatives to air and missile defense interceptors;[53]Need tracking source

    (54) $50,000,000 for acceleration of Army next-generation shoulder-fired air defense system;[54]Need tracking source

    (55) $91,000,000 for production of Army next-generation shoulder-fired air defense system;[55]Need tracking source

    (56) $500,000,000 for development, production, and integration of counter-unmanned aerial systems programs;[56]Need tracking source

    (57) $350,000,000 for development, production, and integration of non-kinetic counter-unmanned aerial systems programs;[57]Need tracking source

    (58) $250,000,000 for development, production, and integration of land-based counter-unmanned aerial systems programs;[58]Need tracking source

    (59) $200,000,000 for development, production, and integration of ship-based counter-unmanned aerial systems programs;[59]Need tracking source

    (60) $400,000,000 for acceleration of hypersonic strike programs;[60]Need tracking source

    (61) $167,000,000 for procurement of additional launchers for Army medium-range air and missile defense interceptors;[61]Need tracking source

    (62) $500,000,000 for expansion of defense advanced manufacturing techniques;[62]Need tracking source

    (63) $1,000,000 for establishment of the Joint Energetics Transition Office;[63]Need tracking source

    (64) $200,000,000 for acceleration of Army medium-range air and missile defense interceptors;[64]Need tracking source

    (65) $150,000,000 for additive manufacturing for propellant;[65]Need tracking source

    (66) $250,000,000 for expansion and acceleration of penetrating munitions production; and[66]Need tracking source

    (67) $50,000,000 for development, procurement, and integration of precision extended-range artillery.[67]Need tracking source

    (b) Appropriation.—In addition to amounts otherwise available, there is appropriated to the Secretary of Defense for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029, $3,300,000,000 for grants and purchase commitments made pursuant to the Industrial Base Fund established under section 4817 of title 10, United States Code.[68]Need tracking source

    (c) Appropriation.—In addition to amounts otherwise available, there is appropriated to the Secretary of Defense for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029, $5,000,000,000 for investments in critical minerals supply chains made pursuant to the Industrial Base Fund established under section 4817 of title 10, United States Code.[69]Need tracking source

    (d) Appropriations.—In addition to amounts otherwise available, there is appropriated to the Secretary of Defense, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029, $500,000,000 to the “Department of Defense Credit Program Account” to carry out the capital assistance program, including loans, loan guarantees, and technical assistance, established under section 149(e) of title 10, United States Code, for critical minerals and related industries and projects, including related Covered Technology Categories: Provided, That—[70]Need tracking source

    (1) such amounts are available to subsidize gross obligations for the principal amount of direct loans, and total loan principal, any part of which is to be guaranteed, not to exceed $100,000,000,000; and

    (2) such amounts are available to cover all costs and expenditures as provided under section 149(e)(5)(B) of title 10, United States Code.


    1. Footnotes ↩︎

    2. Footnotes ↩︎

    3. Footnotes ↩︎

    4. Footnotes ↩︎

    5. Footnotes ↩︎

    6. Footnotes ↩︎

    7. Footnotes ↩︎

    8. Footnotes ↩︎

    9. Footnotes ↩︎

    10. Footnotes ↩︎

    11. Footnotes ↩︎

    12. Footnotes ↩︎

    13. Footnotes ↩︎

    14. Footnotes ↩︎

    15. Footnotes ↩︎

    16. Footnotes ↩︎

    17. Footnotes ↩︎

    18. Footnotes ↩︎

    19. Footnotes ↩︎

    20. Footnotes ↩︎

    21. Footnotes ↩︎

    22. Footnotes ↩︎

    23. Footnotes ↩︎

    24. Footnotes ↩︎

    25. Footnotes ↩︎

    26. Footnotes ↩︎

    27. Footnotes ↩︎

    28. Footnotes ↩︎

    29. Footnotes ↩︎

    30. Footnotes ↩︎

    31. Footnotes ↩︎

    32. Footnotes ↩︎

    33. Footnotes ↩︎

    34. Footnotes ↩︎

    35. Footnotes ↩︎

    36. Footnotes ↩︎

    37. Footnotes ↩︎

    38. Footnotes ↩︎

    39. Footnotes ↩︎

    40. Footnotes ↩︎

    41. Footnotes ↩︎

    42. Footnotes ↩︎

    43. Footnotes ↩︎

    44. Footnotes ↩︎

    45. Footnotes ↩︎

    46. Footnotes ↩︎

    47. Footnotes ↩︎

    48. Footnotes ↩︎

    49. Footnotes ↩︎

    50. Footnotes ↩︎

    51. Footnotes ↩︎

    52. Footnotes ↩︎

    53. Footnotes ↩︎

    54. Footnotes ↩︎

    55. Footnotes ↩︎

    56. Footnotes ↩︎

    57. Footnotes ↩︎

    58. Footnotes ↩︎

    59. Footnotes ↩︎

    60. Footnotes ↩︎

    61. Footnotes ↩︎

    62. Footnotes ↩︎

    63. Footnotes ↩︎

    64. Footnotes ↩︎

    65. Footnotes ↩︎

    66. Footnotes ↩︎

    67. Footnotes ↩︎

    68. Footnotes ↩︎

    69. Footnotes ↩︎

    70. Footnotes ↩︎

  • Sec. 20005. Enhancement of Department of Defense resources for scaling low-cost weapons into production | Law as Amended

    (a) Appropriations.—In addition to amounts otherwise available, there are appropriated to the Secretary of Defense for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029—

    (1) $25,000,000 for the Office of Strategic Capital Global Technology Scout program;[1]Need tracking source

    (2) $1,400,000,000 for the expansion of the small unmanned aerial system industrial base;[2]Need tracking source

    (3) $400,000,000 for the development and deployment of the Joint Fires Network and associated joint battle management capabilities;[3]Need tracking source

    (4) $400,000,000 for the expansion of advanced command-and-control tools to combatant commands and military departments;[4]Need tracking source

    (5) $100,000,000 for the development of shared secure facilities for the defense industrial base;[5]Need tracking source

    (6) $50,000,000 for the creation of additional Defense Innovation Unit OnRamp Hubs;[6]Need tracking source

    (7) $600,000,000 for the acceleration of Strategic Capabilities Office programs;[7]Need tracking source

    (8) $650,000,000 for the expansion of Mission Capabilities office joint prototyping and experimentation activities for military innovation;[8]Need tracking source

    (9) $500,000,000 for the accelerated development and integration of advanced 5G/6G technologies for military use;[9]Need tracking source

    (10) $25,000,000 for testing of simultaneous transmit and receive technology for military spectrum agility;[10]Need tracking source

    (11) $50,000,000 for the development, procurement, and integration of high-altitude stratospheric balloons for military use;[11]Need tracking source

    (12) $120,000,000 for the development, procurement, and integration of long-endurance unmanned aerial systems for surveillance;[12]Need tracking source

    (13) $40,000,000 for the development, procurement, and integration of alternative positioning and navigation technology to enable military operations in contested electromagnetic environments;[13]Need tracking source

    (14) $750,000,000 for the acceleration of innovative military logistics and energy capability development and deployment;[14]Need tracking source

    (15) $125,000,000 for the acceleration of development of small, portable modular nuclear reactors for military use;[15]Need tracking source

    (16) $1,000,000,000 for the expansion of programs to accelerate the procurement and fielding of innovative technologies;[16]Need tracking source

    (17) $90,000,000 for the development of reusable hypersonic technology for military strikes;[17]Need tracking source

    (18) $2,000,000,000 for the expansion of Defense Innovation Unit scaling of commercial technology for military use;[18]Need tracking source

    (19) $500,000,000 to prevent delays in delivery of attritable autonomous military capabilities;[19]Need tracking source

    (20) $1,500,000,000 for the development, procurement, and integration of low-cost cruise missiles;[20]Need tracking source

    (21) $124,000,000 for improvements to Test Resource Management Center artificial intelligence capabilities;[21]Need tracking source

    (22) $145,000,000 for the development of artificial intelligence to enable one-way attack unmanned aerial systems and naval systems;[22]Need tracking source

    (23) $250,000,000 for the development of the Test Resource Management Center digital test environment;[23]Need tracking source

    (24) $250,000,000 for the advancement of the artificial intelligence ecosystem;[24]Need tracking source

    (25) $250,000,000 for the expansion of Cyber Command artificial intelligence lines of effort;[25]Need tracking source

    (26) $250,000,000 for the acceleration of the Quantum Benchmarking Initiative;[26]Need tracking source

    (27) $1,000,000,000 for the expansion and acceleration of qualification activities and technical data management to enhance competition in defense industrial base;[27]Need tracking source

    (28) $400,000,000 for the expansion of the defense manufacturing technology program;[28]Need tracking source

    (29) $1,685,000,000 for military cryptographic modernization activities;[29]Need tracking source

    (30) $90,000,000 for APEX Accelerators, the Mentor-Protege Program, and cybersecurity support to small non-traditional contractors;[30]Need tracking source

    (31) $250,000,000 for the development, procurement, and integration of Air Force low-cost counter-air capabilities;[31]Need tracking source

    (32) $10,000,000 for additional Air Force wargaming activities; and[32]Need tracking source

    (33) $20,000,000 for the Office of Strategic Capital workforce.[33]Need tracking source

    (b) Appropriations.—In addition to amounts otherwise available, there are appropriated to the Secretary of Defense, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029, $1,000,000,000 to the “Department of Defense Credit Program Account” to carry out the capital assistance program, including loans, loan guarantees, and technical assistance, established under section 149(e) of title 10, United States Code: Provided, That—[34]Need tracking source

    (1) such amounts are available to subsidize gross obligations for the principal amount of direct loans, and total loan principal, any part of which is to be guaranteed, not to exceed $100,000,000,000; and

    (2) such amounts are available to cover all costs and expenditures as provided under section 149(e)(5)(B) of title 10, United States Code.


    1. Footnotes ↩︎

    2. Footnotes ↩︎

    3. Footnotes ↩︎

    4. Footnotes ↩︎

    5. Footnotes ↩︎

    6. Footnotes ↩︎

    7. Footnotes ↩︎

    8. Footnotes ↩︎

    9. Footnotes ↩︎

    10. Footnotes ↩︎

    11. Footnotes ↩︎

    12. Footnotes ↩︎

    13. Footnotes ↩︎

    14. Footnotes ↩︎

    15. Footnotes ↩︎

    16. Footnotes ↩︎

    17. Footnotes ↩︎

    18. Footnotes ↩︎

    19. Footnotes ↩︎

    20. Footnotes ↩︎

    21. Footnotes ↩︎

    22. Footnotes ↩︎

    23. Footnotes ↩︎

    24. Footnotes ↩︎

    25. Footnotes ↩︎

    26. Footnotes ↩︎

    27. Footnotes ↩︎

    28. Footnotes ↩︎

    29. Footnotes ↩︎

    30. Footnotes ↩︎

    31. Footnotes ↩︎

    32. Footnotes ↩︎

    33. Footnotes ↩︎

    34. Footnotes ↩︎

  • Sec. 20003. Enhancement of Department of Defense resources for integrated air and missile defense | Law as Amended

    (a) Next generation missile defense technologies.—In addition to amounts otherwise available, there are appropriated to the Secretary of Defense for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029—

    (1) $250,000,000 for development and testing of directed energy capabilities by the Under Secretary for Research and Engineering;[1]Need tracking source

    (2) $500,000,000 for national security space launch infrastructure;[2]Need tracking source

    (3) $2,000,000,000 for air moving target indicator military satellites;[3]Need tracking source

    (4) $400,000,000 for expansion of Multi-Service Advanced Capability Hypersonic Test Bed program;[4]Need tracking source

    (5) $5,600,000,000 for development of space-based and boost phase intercept capabilities;[5]Need tracking source

    (6) $7,200,000,000 for the development, procurement, and integration of military space-based sensors; and[6]Need tracking source

    (7) $2,550,000,000 for the development, procurement, and integration of military missile defense capabilities.[7]Need tracking source

    (b) Layered homeland defense.—In addition to amounts otherwise available, there are appropriated to the Secretary of Defense for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029—

    (1) $2,200,000,000 for acceleration of hypersonic defense systems;[8]Need tracking source

    (2) $800,000,000 for accelerated development and deployment of next-generation intercontinental ballistic missile defense systems;[9]Need tracking source

    (3) $408,000,000 for Army space and strategic missile test range infrastructure restoration and modernization in the United States Indo-Pacific Command area of operations west of the international dateline;[10]Need tracking source

    (4) $1,975,000,000 for improved ground-based missile defense radars; and[11]Need tracking source

    (5) $530,000,000 for the design and construction of Missile Defense Agency missile instrumentation range safety ship.[12]Need tracking source


    1. Footnotes ↩︎

    2. Footnotes ↩︎

    3. Footnotes ↩︎

    4. Footnotes ↩︎

    5. Footnotes ↩︎

    6. Footnotes ↩︎

    7. Footnotes ↩︎

    8. Footnotes ↩︎

    9. Footnotes ↩︎

    10. Footnotes ↩︎

    11. Footnotes ↩︎

    12. Footnotes ↩︎

  • Sec. 20002. Enhancement of Department of Defense resources for shipbuilding | Law as Amended

    In addition to amounts otherwise available, there are appropriated to the Secretary of Defense for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, to remain available until September 30, 2029—

    (1) $250,000,000 for the expansion of accelerated Training in Defense Manufacturing program;[1]Need tracking source

    (2) $250,000,000 for United States production of turbine generators for shipbuilding industrial base;[2]Need tracking source

    (3) $450,000,000 for United States additive manufacturing for wire production and machining capacity for shipbuilding industrial base;[3]Need tracking source

    (4) $492,000,000 for next-generation shipbuilding techniques;[4]Need tracking source

    (5) $85,000,000 for United States-made steel plate for shipbuilding industrial base;[5]Need tracking source

    (6) $50,000,000 for machining capacity for naval propellers for shipbuilding industrial base;[6]Need tracking source

    (7) $110,000,000 for rolled steel and fabrication facility for shipbuilding industrial base;[7]Need tracking source

    (8) $400,000,000 for expansion of collaborative campus for naval shipbuilding;[8]Need tracking source

    (9) $450,000,000 for application of autonomy and artificial intelligence to naval shipbuilding;[9]Need tracking source

    (10) $500,000,000 for the adoption of advanced manufacturing techniques in the shipbuilding industrial base;[10]Need tracking source

    (11) $500,000,000 for additional dry-dock capability;[11]Need tracking source

    (12) $50,000,000 for the expansion of cold spray repair technologies;[12]Need tracking source

    (13) $450,000,000 for additional maritime industrial workforce development programs;[13]Need tracking source

    (14) $750,000,000 for additional supplier development across the naval shipbuilding industrial base;[14]Need tracking source

    (15) $250,000,000 for additional advanced manufacturing processes across the naval shipbuilding industrial base;[15]Need tracking source

    (16) $4,600,000,000 for a second Virginia-class submarine in fiscal year 2026;[16]Need tracking source

    (17) $5,400,000,000 for two additional Guided Missile Destroyer (DDG) ships;[17]Need tracking source

    (18) $160,000,000 for advanced procurement for Landing Ship Medium;[18]Need tracking source

    (19) $1,803,941,000 for procurement of Landing Ship Medium;[19]Need tracking source

    (20) $295,000,000 for development of a second Landing Craft Utility shipyard and production of additional Landing Craft Utility;[20]Need tracking source

    (21) $100,000,000 for advanced procurement for light replenishment oiler program;[21]Need tracking source

    (22) $600,000,000 for the lease or purchase of new ships through the National Defense Sealift Fund;[22]Need tracking source

    (23) $2,725,000,000 for the procurement of T-AO oilers;[23]Need tracking source

    (24) $500,000,000 for cost-to-complete for rescue and salvage ships;[24]Need tracking source

    (25) $300,000,000 for production of ship-to-shore connectors;[25]Need tracking source

    (26) $1,470,000,000 for the implementation of a multi-ship amphibious warship contract;[26]Need tracking source

    (27) $80,000,000 for accelerated development of vertical launch system reloading at sea;[27]Need tracking source

    (28) $250,000,000 for expansion of Navy corrosion control programs;[28]Need tracking source

    (29) $159,000,000 for leasing of ships for Marine Corps operations;[29]Need tracking source

    (30) $1,534,000,000 for expansion of small unmanned surface vessel production;[30]Need tracking source

    (31) $2,100,000,000 for development, procurement, and integration of purpose-built medium unmanned surface vessels;[31]Need tracking source

    (32) $1,300,000,000 for expansion of unmanned underwater vehicle production;[32]Need tracking source

    (33) $188,360,000 for the development and testing of maritime robotic autonomous systems and enabling technologies;[33]Need tracking source

    (34) $174,000,000 for the development of a Test Resource Management Center robotic autonomous systems proving ground;[34]Need tracking source

    (35) $250,000,000 for the development, production, and integration of wave-powered unmanned underwater vehicles; and[35]Need tracking source

    (36) $150,000,000 for retention of inactive reserve fleet ships.[36]Need tracking source


    1. Footnotes ↩︎

    2. Footnotes ↩︎

    3. Footnotes ↩︎

    4. Footnotes ↩︎

    5. Footnotes ↩︎

    6. Footnotes ↩︎

    7. Footnotes ↩︎

    8. Footnotes ↩︎

    9. Footnotes ↩︎

    10. Footnotes ↩︎

    11. Footnotes ↩︎

    12. Footnotes ↩︎

    13. Footnotes ↩︎

    14. Footnotes ↩︎

    15. Footnotes ↩︎

    16. Footnotes ↩︎

    17. Footnotes ↩︎

    18. Footnotes ↩︎

    19. Footnotes ↩︎

    20. Footnotes ↩︎

    21. Footnotes ↩︎

    22. Footnotes ↩︎

    23. Footnotes ↩︎

    24. Footnotes ↩︎

    25. Footnotes ↩︎

    26. Footnotes ↩︎

    27. Footnotes ↩︎

    28. Footnotes ↩︎

    29. Footnotes ↩︎

    30. Footnotes ↩︎

    31. Footnotes ↩︎

    32. Footnotes ↩︎

    33. Footnotes ↩︎

    34. Footnotes ↩︎

    35. Footnotes ↩︎

    36. Footnotes ↩︎